Featured Articles
|
|
A Telecom Operator Improves network manageability, power consumption, and solves overheat problems of its FTTB (Fiber-To-The-Building) service network by deploying Edge-Core Carrier-class Fiber Metro switches.
|
|
Exchange Tower, the New International Grade-A Office Tower in Hong Kong, Deploys Edge-Core Business Class Wi-Fi Solution to Facilitate Quality Services and Enhance Its Ecological Design Concept.
|
|
|
News Center
|
|
- 2009/12/10: Leading ISP Operator in New Siberia, Russia Offers High-Speed, Triple-Play Service with Metro Access Solutions from Edge-Core. Click here for details.
- 2009/11/20: New L3 FE Switch received IPv6-Ready Core Phase-2 Logo Certification . Click here for details.
- 2009/09/04: Edge-Core Announces the Launch for 802.11n Dual Band Access Point. Click here for details.
- 2009/08/14: Edge-Core Enriches Its Green Saving Product Line by Launching New Gigabit Ethernet Fully-Managed Switch for Enterprise Applications. Click here for details.
|
|